Back to Case Studies

marlin industries bespoke solar pv installation

ClientMarlin Industries
IndustryManufacturing
ServiceSolar PPA
  • 656KW

    Groundmounted Solar array
  • 25-YEAR

    Solar PPA
  • 123 Tonnes

    of CO2 saved annually
  • £300k+

    saved annually

Background

Marlin Industries, the cable industry’s leading manufacturing and logistics company, which is committed to sustainable and cost-effective strategies, appointed Power-Zero to install on-site solar PV energy systems at the company’s Wrexham and Hawick sites.

Challenge

A large energy user faced with unsustainable increases in energy prices

Marlin Industries needed to reduce its energy costs significantly without impacting negatively on its environmental performance.

A renewable energy solution that would support Marlin’s carbon reduction targets was required.

Solution

Develop a bespoke solar pv renewable energy solution

Fully-Funded through Power-Zero’s Dynamic Power Purchase Agreement (DPPA), the 328kWp Solar PV system has been designed to match Marlin Industries’ load requirements for electricity at the Wrexham site.

The system will be monitored continuously by Power-Zero’s Operation and Maintenance (O&M) team to ensure it delivers the maximum savings possible.

The first phase of the project includes the installation of a roof mounted array of solar panels at the Wrexham site. Once the installation of the system in Wrexham is complete, Power-Zero will complete a review of the Hawick site to understand the energy requirements before designing and installing the most appropriate system.

The system will be monitored continuously by Power-Zero’s Operation and Maintenance (O&M) team to ensure it delivers the maximum savings possible.

Over £300k+ worth of savings annually.

The Solar array will ensure Marlin achieve their net zero aspirations.

Result

The Solar PV onsite generation systems at both sites are expected to generate more than
640,000 KWh per year through 2,200 roof-mounted panels over a total 3,800 m2 and will be connected to the grid and managed by Power-Zero.

Enhancing market resilience

It will provide increased efficiencies for Marlin as well as increasing the company’s resilience to volatile international energy market.

Seamless energy installation

The installation of the new on-site energy systems will be completed without impacting on normal business operations.

Start a conversation with us today

Max. file size: 64 MB.

When you submit your details through our contact form, we collect and process your information to respond to your enquiry. If you provide your mobile number, you also consent to receiving relevant updates or responses via WhatsApp for Business. You can opt out at any time.

This field is for validation purposes and should be left unchanged.